Back to Case Studies
Cutty Sark, Greenwich
Cutty Sark, King William Walk, London, SE10
Cutty Sark, Greenwich
About the project
PBC were commissioned to inspect all areas internally and externally of the Visitor Centre to prepare a planned preventative maintenance programme schedule for works required over a 10 year period.
PBC Scope
Inspection was completed within a single period without disruption to the attraction, and schedule provided within 2 weeks.