About the project

Refurbishment of existing Grade II listed building which was procured in a split phased approach, phase 1 being the removal and replacement of the roof and phase 2 the internal refurbishment with external extension and courtyard works.

Internally the specification included a very high quality level of finishes with new heating and cooling installations, AV and structural works to provide a new open plan space in the lower ground floor linked to a new structural glazed extension at the rear.

9 Holland Street

PBC Scope

PBC were appointed as cost managers for the comprehensive and highly bespoke refurbishment of 9 Holland Street. The project posed unique challenges due to the listed status, requiring careful consideration of works needed to be sensitive to the planning and heritage requirements.

ArchitectHaines Phillips Architects

Main contractorBroadland Construction (both phases)

9 Holland Street

To review our other cost management projects, please click here.

Instruction

PBC were appointed for Cost Management services on roof replacement and main works phases